CC

CC
FREQUENTLY ASKED QUESTIONS

1. What is your product and what is it made of?
2. Material/size of the workpiece (maximum), weight (maximum).
3. What is your daily production capacity (1 day = 8 uair an chloig, how many pieces per day)?
4. Which heating method do you prefer: electric, gas, diesel, or coal?
5. What are the dimensions of your factory (length, width, height)?

In the pre-sales phase, we conduct a systematic evaluation of the customer’s product characteristics, production capacity targets, and process requirements. Our professional engineering team completes the solution design and technical verification to ensure that the coating production line is feasible, stable, and reliable for long-term operation before entering production.

Yes. All projects must undergo a complete technical review and quality verification process before entering the production phase. The design方案 is strictly based on industry standards and takes into account the customer’s on-site conditions and actual application requirements, ensuring the rationality and stability of the system configuration from the outset.

We provide a 2-year quality warranty for the entire coating production line. The warranty period starts from the date the equipment is installed and passes the final acceptance, covering main equipment and key system components, ensuring long-term stable operation of the production line.

We can provide on-site installation or remote installation guidance based on the actual situation of the project. Experienced engineers are responsible for system installation, commissioning, and technical delivery, ensuring that the production line’s performance meets design standards and can quickly enter normal production.

Yes. After the equipment installation is completed, we will arrange for a dedicated engineer to provide one-on-one support for 90 days to help address operational and process issues during the initial production phase. Additionally, we will provide long-term remote technical support and maintenance advice to ensure the production line continues to run efficiently.

Sure. We can customize the paint production line based on the customer’s factory layout, production capacity requirements, workpiece types, and process requirements, ensuring that the equipment is highly compatible with the actual production conditions.

The delivery cycle depends on the project scale and configuration plan. Standard projects usually enter the production phase after the plan is confirmed, with the timeline clarified after project evaluation and clearly stipulated in the contract.

Yes. After the equipment is delivered, we will provide customers with system operation training and basic maintenance guidance to help operators quickly master the use of the equipment and ensure the production line runs safely and properly.

The painting production line adopts a modular design, with a clear maintenance structure and simple routine upkeep. We will provide maintenance manuals and remote technical support to help customers reduce maintenance costs and offer long-term technical assistance.

IARRAIDH A OBAIR LINN?

Scrollaigh go Barr
Fág Do Theachtaireacht